Aussie Mega Mechanics
S02:E08 - Risky Repairs
S02:É01 - S02:E01 - Crane Down
One of Australia’s largest hydro power stations is undertaking a high stakes valve replacement.
S02:É02 - S02:E02 - Piece by Piece
The Kooragang Coal Terminal is buzzing with the arrival of a newly designed Ship Loading Spout and Trimmer Flap.
S02:É04 - S02:E04 - Back on Track
It’s out with the old and in with the new at Brisbane’s Gallipoli Barracks, where the mechanics of the 2nd/14th Light Horse Regiment are aiming to complete two huge tasks
S02:É05 - S02:E05 - Sky High Stakes
The team at Murray 1, Snowy Hydro’s second largest power station, are reassembling a massive power turbine after extensive cracking was found in the top cover.
S02:É06 - S02:E06 - Slowly but Surely
It’s a nail-biting start to a week-long mechanical marathon for the team of Queensland Rail mechanics, as they work to hoist a six-tonne V12 engine out of the “Spirit of Queensland” locomotive.
S02:É07 - S02:E07 - Feeling the Heat
The team from Lindores Construction Logistics have one day to relocate a massive tower crane on the Queens Wharf development in Brisbane.
S02:É08 - S02:E08 - Risky Repairs
South of Jindabyne, a mini Hydro station is having long-awaited repair work done, thanks to the arrival of a brand new Submerged Discharge Valve.
S02:É10 - S02:E10 - Time Is Money
In Sydney, Leichhardt Bus depot, one of the largest in the Southern hemisphere, the team has to scramble to repair two buses before the morning rush hour.