Watch S01:E14 - Grief Progress Reports 12 to 18 - Monthly Progress UpdatesWeb UI Spinner
S01:E14 - Grief Progress Reports 12 to 18 - Monthly Progress Updates poster

Doggie

S01:E14 - Grief Progress Reports 12 to 18 - Monthly Progress Updates

Reality · 2026 · 21 min · 1 SeasonTV-MASubtitles Icon
Catching up on Grief Progress Reports 12 through 18, covering months of attempts, milestones, improvements, and verification progress.
S01:E01 - Grief 84% - New Best - 66%+ X99 - Stream 346

S01:E01 - Grief 84% - New Best - 66%+ X99 - Stream 346

1 hr 8 min
TV-MA

Grief reaches a new 84% best with 66%+ X99, pushing the extreme demon closer to completion during Stream 346.

S01:E02 - Verifying Grief 80%, 79% X2, 78% - 65%+ X54 - Stream 263

S01:E02 - Verifying Grief 80%, 79% X2, 78% - 65%+ X54 - Stream 263

1 hr
TV-MA

Verifying Grief with repeated 80%, 79%, and 78% runs while pushing past 65% for the 54th time during Stream 263.

S01:E03 - Verifying Grief 80%, 79% X2, 78% - 65%+ X54 - Stream 261

S01:E03 - Verifying Grief 80%, 79% X2, 78% - 65%+ X54 - Stream 261

50 min
TV-MA

Another intense Grief verification stream featuring 80%, 79%, and 78% progress while continuing the push toward a successful completion.

S01:E04 - Verifying Grief 80% - 65%+ X54 - Stream 274 - Part 2

S01:E04 - Verifying Grief 80% - 65%+ X54 - Stream 274 - Part 2

20 min
TV-MA

Continuing the Grief verification grind with repeated 65%+ runs and an 80% best during Stream 274, Part 2.

S01:E05 - I Beat the Geometry Dash Speedrun World Record

S01:E05 - I Beat the Geometry Dash Speedrun World Record

20 min
TV-MA

Attempting to break the Geometry Dash speedrun world record in a high-speed challenge filled with intense runs and close attempts.

S01:E06 - Avernus 100% - Doggie December Finale 2025

S01:E06 - Avernus 100% - Doggie December Finale 2025

19 min
TV-MA

Completing Avernus at 100% during the Doggie December 2025 finale, delivering a huge Geometry Dash achievement.

S01:E07 - Geometry Dash, but It Randomly Swaps Players! (Ft. Zoink)

S01:E07 - Geometry Dash, but It Randomly Swaps Players! (Ft. Zoink)

18 min
TV-MA

Playing Geometry Dash with Zoink while the game randomly swaps players, creating unpredictable gameplay and hilarious moments.

S01:E08 - I Forced Icedcave to Play Grief

S01:E08 - I Forced Icedcave to Play Grief

17 min
TV-MA

Challenging Icedcave to play Grief and taking on one of Geometry Dash's most demanding levels together.

S01:E09 - I Played Your Randomized Challenges (Doggie Challenges #14)

S01:E09 - I Played Your Randomized Challenges (Doggie Challenges #14)

17 min
TV-MA

Taking on your randomized Geometry Dash challenges in Doggie Challenges #14, featuring unpredictable levels and difficult gameplay.

S01:E10 - The #1 Mario Speedrunner vs Geometry Dash

S01:E10 - The #1 Mario Speedrunner vs Geometry Dash

16 min
TV-MA

The world's top Mario speedrunner takes on Geometry Dash in an unexpected gaming showdown filled with challenges and surprises.

S01:E11 - Doggie vs Zoink (Geometry Dash)

S01:E11 - Doggie vs Zoink (Geometry Dash)

14 min
TV-MA

Doggie faces Zoink in a competitive Geometry Dash battle featuring difficult levels, impressive gameplay, and intense moments.

S01:E12 - Geometry Dash Eye Tracker Challenge and Grief Monthly Highlights

S01:E12 - Geometry Dash Eye Tracker Challenge and Grief Monthly Highlights

26 min
TV-MA

Exploring Geometry Dash challenges, eye tracker gameplay, and the latest Grief progress in this monthly highlights compilation.

S01:E13 - Grief Progression: Day 1 to Day 600 and Top 1 Verification

S01:E13 - Grief Progression: Day 1 to Day 600 and Top 1 Verification

24 min
TV-MA

Following Grief from Day 1 to Day 600 as the extreme demon progresses toward Top 1 verification with countless attempts.

S01:E14 - Grief Progress Reports 12 to 18 - Monthly Progress Updates

S01:E14 - Grief Progress Reports 12 to 18 - Monthly Progress Updates

21 min
TV-MA

Catching up on Grief Progress Reports 12 through 18, covering months of attempts, milestones, improvements, and verification progress.

S01:E15 - Geometry Dash Challenges, Hacker Guessing and the End Is Here

S01:E15 - Geometry Dash Challenges, Hacker Guessing and the End Is Here

16 min
TV-MA

A chaotic Geometry Dash compilation featuring difficult challenges, hacker guessing, surprising moments, and the final stages of a major journey.

S01:E16 - Geometry Dash Madness - Trolls, Demon Challenges and Pro Player Battles

S01:E16 - Geometry Dash Madness - Trolls, Demon Challenges and Pro Player Battles

31 min
TV-MA

Geometry Dash madness with trolls, extreme demon challenges, pro player battles, and some of the wildest moments from the game.

Genres

Subtitles

English
TV-MA
This program is specifically designed to be viewed by adults and therefore may be unsuitable for children under 17.
Welcome to Tubi
Unlimited Movies, TV Shows, and Live News
Credit Card Off Icon
Free Forever
No credit card required
Find the Unfindable
All your favorite titles and so much more
Account 24 Icon
Better When You Register
Personalize your experience
Slash
S01:E14 - Grief Progress Reports 12 to 18 - Monthly Progress Updates
Copyright © 2026 Tubi, Inc.
Tubi is a registered trademark of Tubi, Inc.
All rights reserved.
Device ID: ce8fe533-0b85-4390-aaff-f67450b209b1
Made with Heart in San Francisco