Web UI Spinner

Mega Builders

S05:E05 - Phu My Bridge

2010 · 5 Saisons · 46 minSubtitles Icon
TV-PG
In Ho Chi Minh City (formerly known as Saigon), engineers are on a mission to modernize. Construction is underway to raise Phu My Bridge, a brand-new $100 million cable-stayed bridge. The bridge is a cornerstone in a visionary plan of growth. Vietnam is nation rising out of a long economic slump, but as the country begins to flourish, progress is bringing gridlock to the streets of Ho Chi Minh City. The Phu My Bridge will be a critical link in a new highway system that the city’s planners hope will relieve traffic congestion in the urban core. The job to solve the problem falls on the shoulders of a crack engineering team. Construction Manager Kurt Feller faces the brunt of pressure to build the bridge. He must lead the team, and deliver the bridge on its due date – Independence Day in Vietnam. It’s a job the former Swiss military Sergeant takes on like a man going into battle. Australian Tim Pittaway, the Bridge Manager, keeps operations on the cable-stayed bridge deck in line and on schedule. French engineer Alain Granet is a contractor who must pull off the most dangerous lifts on the site. Vietnamese-Canadian T.T. Tran and young Vietnamese engineer Nguyen Thanh Nam round out the team in a suspense-filled drama above the Saigon River. The pressure is on the engineering team as deadlines move up and the delivery date looms.

S05:É01

Chargement

S05:É02

Chargement

S05:É03

Chargement

S05:É04

Chargement
S05:É05 - S05:E05 - Phu My Bridge
Play Icon

S05:É05 - S05:E05 - Phu My Bridge

46 min
TV-PG

In Ho Chi Minh City (formerly known as Saigon), engineers are on a mission to modernize. Construction is underway to raise Phu My Bridge, a brand-new $100 million cable-stayed bridge. The bridge is a cornerstone in a visionary plan of growth. Vietnam is nation rising out of a long economic slump, but as the country begins to flourish, progress is bringing gridlock to the streets of Ho Chi Minh City. The Phu My Bridge will be a critical link in a new highway system that the city’s planners hope will relieve traffic congestion in the urban core. The job to solve the problem falls on the shoulders of a crack engineering team. Construction Manager Kurt Feller faces the brunt of pressure to build the bridge. He must lead the team, and deliver the bridge on its due date – Independence Day in Vietnam. It’s a job the former Swiss military Sergeant takes on like a man going into battle. Australian Tim Pittaway, the Bridge Manager, keeps operations on the cable-stayed bridge deck in line and on schedule. French engineer Alain Granet is a contractor who must pull off the most dangerous lifts on the site. Vietnamese-Canadian T.T. Tran and young Vietnamese engineer Nguyen Thanh Nam round out the team in a suspense-filled drama above the Saigon River. The pressure is on the engineering team as deadlines move up and the delivery date looms.

S05:É06

Chargement

S05:É07

Chargement

Genres

Télé-réalité

Sous-titres

English
TV-PG
Ce programme contient du contenu que les parents peuvent juger inapproprié pour les jeunes enfants.
Bienvenue sur Tubi
Films, séries et nouvelles en direct illimités
Credit Card Off Icon
Gratuit à vie
Aucune carte requise
Trouvez l’introuvable
Tous vos titres favoris et bien plus encore
Account 24 Icon
Encore mieux en vous inscrivant
Personnalisez votre expérience
Slash
S05:E05 - Phu My Bridge
Tous droits réservés © 2026 Tubi, Inc.
Tubi est une marque déposée de Tubi, Inc.
Tous droits réservés.
ID de l'appareil : f6dc2fb3-6d81-461f-9b02-a2f0b39e3c48
Fait avec Heart à San Francisco